the large keel installation
Posted by Liu Yi over 6 months ago
skeleton ceiling should be hanging in the main structure, and tighten the nut to control fixed hanger design elevation; pipeline and equipment within the ceiling will not be suspended solid in light steel skeleton. 4 cover panel block clearance joint is not straight:
construction sector specifications, cable alignment, installation to ensure fair on the straight. 5 seam, pressing strip is not tight straight: construction should pull on it after fixation, pressure viscosity. The construction technology of light steel keel gypsum board
ceiling including material purchase requirements, main equipment and accessories operating conditions, process flow, product protection, pay attention to the seven aspects of the quality problems, the most important is the construction process of the concrete.
[url=http://pvcboardprice.com/Wood-Flooring/11043.html]affordable pvc decking prices[/url]
[url=http://pvcboardprice.com/Wood-Flooring/11044.html]courtyard plastic fencing[/url]
[url=http://pvcboardprice.com/Wood-Flooring/11038.html]cheap green composite fence in america[/url]