Connect with
KP Alumni now!

recent registrants


Forums - Sports - for construction

for construction

Posted by Liu Yi over 6 months ago

1 meter can not be fixed, paste the finished tile, the outlet of the process requirements is 1 mm out of the wall. 4. Puddle water pipe standards: water requirements at 750 mm from the ground. 5. Connect the toilet water pipe standard: the distance between the water pipe and water pipe is 10 cm. 6. Water pipe fixed process standard kitchen and bathroom water pipe, not more than 1 meter away from the outlet, because after the tiling, can not guarantee the outlet and tile phase, so the water needs tiles to solid point, the outlet of the process The requirement is 1mm out of the wall. In the future use of the process, if the phenomenon of lax interface, the water will go down the wall root penetration, will not seep into the neighbors and downstairs. 7, the toilet water standard [url=http://syntheticboard.com/synthetic-board/231.html]cost of wood plastic composite process[/url] [url=http://syntheticboard.com/diy-deck/3080.html]white composite porch flooring[/url] [url=http://syntheticboard.com/synthetic-board/1611.html]composite deck wood for sale[/url]