decoration wood floor
Posted by Liu Yi over 6 months ago
Chinese wooden floor laid floor is a trival thing, after before need is considered,[url=http://durablewpcproduct.com/cheap-wpc/3517.html]wood composite panel cladding system[/url] thinking, do work of sufficient sufficient preparation. Chief tells owner related Lin Chang floor, the ground before advertent shop wanting to install in extending the process on outfit ground deals with, wooden floor shop installs 3 link.
The ground before the shop installs deals with: [url=http://woodcompositedeck.com/project-case/1350.html]difference between ipe and wpc[/url] The first, go up cleanly. Assure the evenness on the ground, as dry as a chip He Jie is clean. The 2nd, waterproof and moistureproof deal with. Waterproof coating should daub is average, juncture place should use coating or cement is brushed fill reach the designated position,[url=http://durablewpcproduct.com/wpc-product/1281.html]Wpc Flooring Supplier in Dubai[/url] and be in with conduit vicinity even daub the waterproof coating with 30 expensive centimeter. The 3rd, if the circumstance on the ground is too wet, should use pearl cotton render, return floor opposite to besmear even one moistureproof safeguard lacquer.
Wood Floor shop is installed Advertent item: The first, wooden floor moisture content should be in 11% the left and right sides. The 2nd, buy the floor board after coming home, [url=http://woodcompositedeck.com/project-case/2282.html]plastic wood floor boards for boats[/url] 16 ℃ reach best preexistence the room temperature transfer to a lower level of 18 ℃ two days.
The 3rd, the floor that obligate wants to give 1 centimeter or so between floor and metope is adjustable seam.
Finally, inside 48 hours when floor shop installs, want to prevent to ambulate and set a heavy thing, for put apart of floor glue cohere enough time. The floor board that firm store has installed had better use cleaner or broom is clean.