Connect with
KP Alumni now!

recent registrants


Forums - Reunions - Venues - What paved floor

What paved floor

Posted by Wangkiky Wangkiky over 6 months ago

Home decoration process, such as the use of wood flooring flooring, general construction should be according to the following procedures: (1) clean and dry so that the ground level, and two times brushing waterproof coating; (2) (commonly known as wood joists) The floor frame elastic line direct wood-frame shop. Sectional dimension wood frame or body side is 3Omm'40mm 4Omm'50mm, its connection to a semi-groove fastening and screw fastening of the adhesive applied. After using the impact drill on the wooden frame and ground drill holes, with bolts to make it with the ground fixed, and check whether the frame is level. (3) based on the wooden frame nailed panel. Atsugi base panel can be thick plywood or wooden slats and plywood edges and slats to make ends all the needles in wood frame in line. (4) according to the size of each floor and room area dimensioned floor puzzles and playing the line, usually well-formats, chevron style, ladder and so on. (5) by elastic line test shop, wood core material up, down sapwood, width between the board and the board of not more than 1mm. After repeated adjustments are numbered, the construction by number of people in the middle bedroom to the surrounding paving. Pawnshop to foundation, should remain a board wide vacancy, vacancy stuffed wood on the floor and against the water, matter began to block the wedge top tight end, tight rows of the floor. (6) with a length of wood thickness of 2 to 2.5 times the nails, flatten its head, from the concave corners of the plate obliquely driving. The case of hard wood, the hand drill to drill a smaller diameter than the oblique circle nail holes to prevent needle split wood floors. (7) After sweeping the ground clean and press the vertical aspect of coarse grain planing again, then fine grain direction along the plane again, and then polished. Planing mill total thickness not exceeding 1.5mm. (8) Remove the ground around the top tight block, stair income side, income Mai available long strips of wood, wood flooring strips can also be used. (9) After the polished floor paint, dry after waxing. Construction Points: ① wood frame must be fixed in the ground level. ② to try to squeeze when laying wooden floors adjacent to tight seamless, water adjacent floor height does not exceed ± 1.5mm, and close attention to the edge of the floor. Article Source: [url=http://compositefloorboard]composite floor board[/url] [url=http://compositefloorboard.com/polymer-deck/3100.html]wood decking distributor in the philippines[/url]