Connect with
KP Alumni now!

recent registrants


Forums - Sports - Type asphalt pavement maintenance vehicles

Type asphalt pavement maintenance vehicles

Posted by Liu Yi over 6 months ago

The key equipment involved in this technology:         Asphalt mixture directly determines the quality of pit repair, in order to ensure the quality of pavement pit road mixture, road too much machinery for the current road maintenance dug pit the drawbacks of the existing needs analysis, production and research and development of miniature energy-saving asphalt mixing Station,[url=http://roadroutercrack.com/blog-new/4879.html]Thermal regeneration road maintenance truck Pothole patcher[/url] asphalt mixture insulation transport product portfolio for the perfect solution to solve the pothole repair road puzzles, Henan Road Maintenance Road Machinery Co., Ltd. launched a new "road pit fine repair complete sets of technology", this technology greatly enhance the Road pits dug filling fine degree of operation, in line with national low-carbon environmental protection, safety and civilized construction requirements. 1, pit digging the drawbacks of the existence         1. Routine minor repairs (especially pit trenching operations) Occur in the month usually in the summer (temperature above 10 ℃) for a winter maintenance and maintenance can not start.         2. In order to ensure the maintenance of the required mixture, pit dug usually wait until the asphalt mixing station during production, there is a "pit does not fill the pit, the pit does not fill in the repair" phenomenon, missed the conservation of the favorable opportunity .        3. Dump truck transport mixture temperature on the way to lose quickly, how much is not easy to grasp the discharge,[url=http://roadroutercrack.com/blog-new/6874.html]Very practical Crack Sealant[/url] there is mixture segregation phenomenon. 2, the main innovation       1. This technology is not subject to climatic conditions, can be used throughout the year.       2. Micro-energy asphalt mixing station to meet your adverse season, small quantities, low-cost supply of the mixture;       3. Asphalt insulation transport boxes to solve the asphalt mixture during transport temperature loss,[url=http://roadroutercrack.com/blog-new/5955.html]Trusted Asphalt Construction Equipment[/url] segregation and other issues;       4. Pits interface repair agent can achieve four seasons of cold construction, 1 hour to achieve 95% of the modified indicators to ensure effective bonding interface.