Process of a Fixed-Site Asphalt Concrete Factory
Posted by Liu Yi over 6 months ago
The front-lift loads crushed stone of different fractions delivered in advance, [url=http://pavementrepairmachine.com/buy/74.html]Volvo Asphalt Mill[/url] to the hoppers of the inert material warehouse. Loader loads the crushed stone to the inert material warehouse.
Then amount of material,[url=http://pavementrepairmachine.com/buy/363.html]Hydraulic Equipment Houston[/url] pre-programmed by the operator, is measured, using the dispenser with conveyor belts and fed to the assembly band conveyor. The band conveyor delivers the material to the drying drum.
Once in the drying drum, the material is subjected to heating (drying), [url=http://pavementrepairmachine.com/repair-machine/1809.html]green concrete cutting[/url] with a burner mounted at one end of the drum, which feeds the flame to the drum nuclear. Efficient burners are complex (they operate on fuel oil and diesel fuel).
The drum has good insulation and sealing,[url=http://pavementrepairmachine.com/buy/662.html]Cascade Concrete Industries[/url] that protect it from air penetration. The heating smoothness is achieved by the rotation of the drum together with material. Inner drum walls have special barriers, called bulkheads, catching material.