Connect with
KP Alumni now!

recent registrants


Forums - Job Networking - Process engineering installation

Process engineering installation

Posted by Wangkiky Wangkiky over 6 months ago

Process engineering installation of embedded parts actinomycetes install handrails column and the column connecting polished Second, install embedded parts (after Jiamai member) embedded parts staircase handrail installation can only be used after Jiamai member practices, its approach is to use expansion bolts and steel to create the rear connector, first put on the [url=http://porchdeckingwholesale.com/cladding/15272.html]south african decorative wooden fencing outdoor[/url] grassroots civil line, determine the position of the fixed point of the column, and then drill for hammer drilling in the ground on the stairs, and then install expansion bolts, bolt retaining sufficient length after positioning the bolt , tighten the bolts at the same time between the nut and the screw welded shut to prevent loosening of the nut and steel plate. Handrail connection with the wall surface is also taking the above method. Third, the pay-off due to the above after Jiamai piece construction, there may be errors, therefore, before the column installation, you should re-pay-off, in order to determine the location of the buried [url=http://landscapedecking.com/new/10083.html]custom composite decking in Kenya[/url] plate and welding pole of accuracy, if the deviation, promptly corrected. It should ensure that all stainless steel column located on a steel plate, and four weeks can be welded. Fourth, when you install the column welding post, with the need to double, to keep a hold on a vertical pipe, the welding can not shake another person welding, welding to four weeks, and should meet the welding specifications. Then put directly into the armrest column recess, spot welding installed sequentially from one end to the other end, adjacent to the handrail installed [url=http://porchdeckingwholesale.com/blog/1900.html]plastic composite fence panel[/url] docking accurate, tight joints. After docking adjacent steel, stainless steel welding seam welding. Before welding, weld must be along within the range 30 ~ 50mm on each side of the oil, burrs, rust, etc. clean. Sixth, after polishing all soldered by hand grinder grinding machine will weld tie sanding until no significant welds.