Connect with
KP Alumni now!

recent registrants


Forums - Sports - Garbage compressor how to gain a foothold?

Garbage compressor how to gain a foothold?

Posted by Liu Yi over 6 months ago

In recent years, with the city's economic development and regional expansion, urban production, the day the amount of waste is increasing. As an important part of the urban waste treatment process,[url=http://roadroutercrack.com/blog-new/7637.html]classic vehicle display screen working principle[/url] the waste transfer treatment equipment is responsible for the daily life of the public. It plays an irreplaceable role in urban environmental improvement.      However, the city's garbage compressors are mostly distributed in the urban densely populated areas. Because the waste transfer station to varying degrees there is odor dispersion, transport vehicles, such as leakage of doubt, many people on their own near the refuse transfer station quite dissatisfied with the resistance to the community adjacent to establish a waste transfer station collective things happen.       In recent years, many cities have planned to build new waste compacting stations with more processing power and deodorizing skills. Nonetheless, some new refuse transfer stations will still be rejected by neighboring residents. Waste transfer station construction and thus caught in the old station was complaints, the new station is difficult to establish a dilemma.       Now, in the majority of urban waste classification has not yet been put in place, all the waste must be transported to the transfer station, and then transported by the transfer station to the waste landfill or combustion enterprises. The question is whether the RTS will have an impact on the surrounding areas. Should the planning of the city be considered in conjunction with the increasing number of RTSs,[url=http://roadroutercrack.com/blog-new/1105.html]high tech driveway sealing equipment[/url] it should also consider how to reduce the impact on the surrounding environment, especially considering the feelings of the public. This is undoubtedly the key to tackling the problem between urban refuse transfer stations and the public.       The Ministry of Construction issued the "urban environmental health equipment set norms" rules, the city every 0.7 square kilometers to 1 square kilometer should be set up a small transfer station. The relevant norms and rules also requested that the district before the construction of the transfer station for the waste to make the relevant plans. However, the reality of the conditions, urban waste transfer station planning and setting is far from this ambition. Similar norms or rules are not mandatory, which in large part lead to difficulties in site selection.       For the above situation, the author believes that the state should further improve the relevant laws and regulations, the establishment of the transfer station and other related matters to make more clear rules. If the waste transfer station to adopt a unified plan, unified management, that is, the newly developed residential or commercial district, in the early plan must be part of the sanitation to participate in the design of the district must have a waste collection site, or the relevant parts of the approval not passed.       As the primary responsibility of urban environmental management, the government should increase the financial input of urban public sanitation work by linking with the actual needs of the city,[url=http://roadroutercrack.com/blog-new/7120.html]Irregular Fractured Asphalt Processing Method[/url] including the renewal and strengthening of the hardware facilities of the distribution, storage, tightening and transshipment of waste transfer equipment, Transport equipment into the city Huimin project and the image of an important part of the project.       In addition, the relevant part of the mechanism of innovation and implementation of efforts to be strengthened. The construction units, EIA units and government regulatory departments should not be involved in the public participation in the EIA. Before the planning, project implementation and implementation of the waste transfer facilities, they should conduct research, listen carefully to the public opinion, and consider the risk- To be treated and avoided. In the implementation of related links and the implementation process more transparent and fair basis, to reshape the public's trust. Along with this, the sanitation sector to promote the waste transfer station from low-end to high-end change, through the induction of measures to minimize the impact of disturbing to gradually eliminate public concerns and worries for more public support for urban public environmental work.       Waste transfer station has been hailed as the city's bathroom, should be met to meet the needs of science, detailed organization and management. Construction, urban management, land,[url=http://roadroutercrack.com/blog-new/6671.html]Perfect Thermal Spray Gun For Use On The Road[/url] environmental protection, water conservancy and other relevant departments to establish a co-ordination mechanism. On the one hand, the rationalization of the construction of waste transfer station construction plan, the management of the old waste transfer station; the other hand, after the establishment of a new high-standard station, is to deal with nuisance questions.