Construction Technology of Intelligent Asphalt Crane Synchronization

Posted by Liu Yi over 6 months ago

Process principle: fiber sealing technology refers to the use of fiber core materials at the same time sprinkle (sprinkle) cloth asphalt binder and glass fiber,[url=http://maintenancemachineprice.com//road-maintenance-machinery/asphalt-seal-coating-specifications.html]asphalt seal coating specifications[/url] and then spread the rubble on the top after the formation of a new wear layer or stress absorption of the middle layer A New Road Construction and Maintenance Technology. Process Overview: fiber cover construction, through a special process of broken fiber cutting in the upper and lower layers of evenly distributed asphalt binder was evenly distributed to each other, with each other, and asphalt mixture to form a network winding structure,[url=http://maintenancemachineprice.com//crack-repair/uk-milling-machine-construction.html]uk milling machine construction[/url] effectively improve The cover of the tensile, shear, compression and impact strength and other comprehensive mechanical properties. Similar to the new road between the grassroots and the surface layer or on the basis of the original road with a layer of high elasticity and high strength protective mat. Especially for the old asphalt pavement (or new subgrade), the surface layer of the middle layer of stress absorption layer construction,[url=http://maintenancemachineprice.com//crack-repair/seal-coat-asphalt-machine-jp.html]seal coat asphalt machine jp[/url] and the original old asphalt pavement wear layer construction. On the old and new asphalt road construction and conservation play an effective protective effect, but also to extend its conservation cycle and service life. Supporting the use of equipment: fiber sealing equipment 1, insulation asphalt tanker, gravel spreading car, tire roller, road cleaning equipment and other small equipment. Construction of raw materials: modified emulsified asphalt, basalt fiber and gravel Construction process: 1 filled with emulsified asphalt asphalt insulation car traction fiber sealing equipment for 2 layers of asphalt spray → gravel bus to follow the fiber sealing equipment Stone spreading, stone sprinkling should be completed in the asphalt before the demolition of the debris - a section of gravel,[url=http://maintenancemachineprice.com//crack-repair/road-maintenance-truck-nation.html]road maintenance truck nation[/url] should immediately follow the roller crusher roller rolling operation, rolling 2-3 times → sweep the road to the remaining pieces of gravel cleaning can be recovered Fully open traffic.