Connect with
KP Alumni now!

recent registrants


Forums - Sports - Application of waste asphalt in pavement maintenance

Application of waste asphalt in pavement maintenance

Posted by Liu Yi over 6 months ago

Zhuzhou section of the maintenance of the construction site in the lotus high-speed, with "road physician," said the road maintenance car geothermal vitality and then arranged into a 20-meter-long orange long to 4 to 10 meters per minute speed,[url=http://roadroutercrack.com/blog-new/1316.html]Anti rain series asphalt driveway contractors[/url] had potholes Of the asphalt pavement a new look. Road maintenance no road closures, no traffic jam, the scene did not leave asphalt waste and waste.        It is understood that the local hot regeneration technology selection of "hot bond" in the road maintenance construction, waste asphalt pavement materials 100% back to use, more than two hours after the opening, environmental protection and efficient. The section of the person in charge, the repair of the 11 km road, duration from the previous needs of nearly 3 months shortened to less than 1 month, nearly half of the reduction in employment,[url=http://roadroutercrack.com/blog-new/2553.html]Pavement Grooving Reduces Accidents Concrete Construction[/url] skills than traditional skills increased by 3 times the number of road life was significant extend.    The skills identified by the Ministry of Transport, "the world's first" level, in our province's Linchang high-speed, Lotus Yi-speed, high-speed maintenance of Tan Shao has been widely used. After calculation, only to maintain the lotus high-speed,[url=http://roadroutercrack.com/blog-new/2279.html]Advanced construction gravel spreader[/url] more traditional skills, construction waste can be reduced asphalt mixture 17280 tons, saving 10,800 tons of new asphalt, reducing emissions 186 million cubic meters, 476 tons of carbon dioxide emissions.